Beverly Hills Detached ADU: A One-Bedroom Home in Approximately 500 Square Feet
7 hours ago
1 min read
Ohayon Construction’s Beverly Hills ADU project is a detached, one-bedroom accessory dwelling unit of approximately 500 square feet.
Completed in 2026. Construction duration: approximately six months.
The design challenge: a greater sense of space
The biggest challenge was making the interior feel larger than its approximately 500-square-foot footprint. An open-concept connection between the kitchen and living room, together with larger windows, helped create that greater sense of space.
The detached one-bedroom ADU combines a compact footprint with an open kitchen and living area. Larger windows further contributed to the more spacious feel.
Project timelines describe this completed project. Your schedule will depend on scope, selections, site conditions and required approvals.




Comments